After the spectacular transport of the two 53m long bridge girders through Berlin at night, which was accompanied by local television and the loading onto ship in the port of Königs Wusterhausen, the two bridge girders have arrived in the port of Basel. Here they are being transported by rail to the customer in Muttenz, near Basel where they will be assembled at the end of the week.